Deutsches Elektronen-Synchrotron DESYA Research Centre of the Helmholtz Association
14. Januar 2020 Installation of U32 undulator started The installation of the U32 2m-long undulator into the storage ring started. Commissioning is underway!
06. Januar 2020 Drilling holes into the storage ring tunnel Today, the 1.5m deep hole for connecting the front-end (inside the tunnel) and the beamline optics (in optics hutch) have been successfully drilled.