P62 News

14. Januar 2020
Installation of U32 undulator started

The installation of the U32 2m-long undulator into the storage ring started. Commissioning is underway!

06. Januar 2020
Drilling holes into the storage ring tunnel

Today, the 1.5m deep hole for connecting the front-end (inside the tunnel) and the beamline optics (in optics hutch) have been successfully drilled.