FEL Achievements 2004 |
December 14, 2004:
First beam through undulator
After the shutdown to upgrade from the VUV-FEL at TTF1 to the FLASH user facility, the electron beam was transported through the 30m long undulator for the first time today.
February 2004:
Start of Europeanization of the X-Ray Laser Project at DESY
|